Skip to content
Facilities manager checking a work order beside electrical panels.

Plant, lifts and energy, managed in one system.

Equipment, planned maintenance, work orders, contractors and the EECA energy pack, on the same record as the leases and the owners.

Work order WO-0318

Pump P-02, B2 pump room

● Closed
Reported08:42, by Centre A security
Closed on site10:15, 3 photos
SLA, 4 hoursMet

What Facilities & Energy provides.

Six capabilities, used by in-house engineering teams and FM contractors.

Facilities technician using a mobile device beside electrical panels.

Planned maintenance

PPM CH-02, checklist 18 of 18 done

Status:
ok

Planned maintenance

Maintenance runs on schedule, with checklists completed on site.

Facilities manager checking a work order beside electrical panels.

Work order WO-0318

Pump P-02 closed, SLA 4 hours met

Status:
ok

Work orders

Faults are logged with location and photos, and closed within the agreed SLA.

Operations lead walking the shopping centre with a colleague.

Escalator E-03, L2 north

Inspected and closed before opening

Status:
ok

Lifts and escalators

Each lift and escalator has one record with its manuals, history and CF date.

Facilities manager checking a work order beside electrical panels.

EECA energy pack

Meter MSB-1 read, 48,210 kWh

Status:
ok

Energy metering

Metered energy and the energy manager’s reports are ready for the Energy Efficiency and Conservation Act 2024.

Facilities technician using a mobile device beside electrical panels.

Contractors

KL Lift Services checked in, 08:05

Status:
ok

Contractors

Permits, attendance and completion are recorded against each job.

Operations lead walking the shopping centre with a colleague.

Permit to work

PTW-0412 approved, chiller CH-02

Status:
ok

Permits to work

Each permit to work is approved before the job starts and closed when it ends.

The work, recorded where it happens.

Each photograph shows a task that writes to the equipment record.

Planned maintenance

A rooftop plant round is logged against each asset tag.

Facilities manager checking a work order beside electrical panels.
09:41

Planned maintenance

CT-01 round

Done

Round completed

Done

Checklist 12 of 12

Scheduled

Next round, 09:30

EECA energy pack

A meter reading is taken for the energy pack.

Facilities technician using a mobile device beside electrical panels.
09:41

EECA energy pack

Meter MSB-1

48,210 kWh

Read 07:30, Centre A

Recorded

March energy report

Due 5 Apr

Energy manager review

Technician app

Technicians see their jobs, scan equipment QR codes and close work on a phone.

Facilities manager checking a work order beside electrical panels.
09:41

My jobs, today

Centre A, 4 jobs

Closed

WO-0318 Pump P-02

Closed

E-03 Escalator

Logged

D-14 Defect, 2 photos

Used in Anycomp Mall and Anycomp Property.

Statutory Compliance & Safety works alongside it: lift and escalator CF, Bomba fire certificate and licences, with 60, 30 and 7-day alerts.

A multilevel shopping centre atrium with open walkways and escalators.
ANYCOMP MALL

Anycomp Mall

Escalators, chillers and the fire system across the centre.

ANYCOMP MALL

Anycomp Mall

Escalators, chillers and the fire system across the centre.

See Anycomp Mall
Property staff reviewing a document with a resident at a condominium counter.
ANYCOMP PROPERTY

Anycomp Property

Pumps, lifts, gates and guard tours across every client’s buildings.

ANYCOMP PROPERTY

Anycomp Property

Pumps, lifts, gates and guard tours across every client’s buildings.

See Anycomp Property

Questions from engineering and FM teams.

Answers to the questions asked most often in the first call.

Shopping centre operations team walking through a mall.

Work orders

Escalator E-03 closed before opening

Can an existing maintenance system stay?

Yes. Work orders and equipment can be imported, and Facilities & Energy takes over when the client is ready.

EquipmentWork ordersPPM history

Imported to one equipment record

Do FM contractors use the technician app?
Does the energy pack cover the EECA 2024?
How are lift and escalator CF dates tracked?
Do technicians need a laptop on site?
Is Facilities & Energy sold on its own?
Company representative looking across a shopping centre atrium.

Book a strategy session

90 minutes with a principal of Anycomp. It ends with a written scope and a quotation.

Office +60 3-8094 9630
Mobile and WhatsApp +60 11-2916 0777

Session agenda, 90 minutes

10:00Current operation10:30Record and controls11:00Scope and quotation